CONSTRUCTION / Energy ProjectsCustomer
DEPA COMMERCIAL SAMain Constructor
Α.Τ.Ε.Κ.Ε.Position
Sximatari AtticaProject
Compressed Natural Gas InstallationComplation Date
2020ATEKE undertook the construction of the CNG facility with direct connection to NG network, on behalf of DEPA COMMERCIAL SA in the 65th Km of National road Athens – Lamia (both sides) – Sximatari. The project included civil engineering works, installation of compressors CUBOGAS Srl S50B HT, storage vessels of total capacity 1.440lt CUBOGAS Srl PS300, CNG dispensers WAYNE FUELING SYSTEMS ITALIA Srl model HELIX, pipeline network of low, medium and high pressure, special equipment such as pneumatic valves , overflow valves, safety valves etc, lightning protection with franklin rods, electrical networks and grounding. The project was completed with complete success and within the predetermined schedule.